Usually Microsoft Project saves file as MPP format. However, Primavera allows us to import Microsoft Project files in MPX format.
So, here is the tool help you to convert MPP to MPX.
Download from Google Drive:
Download from Onedrive:
Usually Microsoft Project saves file as MPP format. However, Primavera allows us to import Microsoft Project files in MPX format.
So, here is the tool help you to convert MPP to MPX.
Download from Google Drive:
Download from Onedrive:
Hello,
Why can’t I download the file? Is the link still active?
Thank you
LikeLike
Hi,
Yes the link is still active. I’ve just tried it.
LikeLike
I have given the source file path….then the destination file also.
After pressing the convert option it is showing a message that ” Please close Microsoft Project”.
It is already closed , then why this error is showing.
LikeLike
I don’t have this error when use it in my PC. Can you restart computer and try again.
LikeLike
I keep getting the same error
After pressing the convert option it is showing a message that ” Please close Microsoft Project”.
It is already closed
LikeLike
i have given both source and destination file it is showing a message that please close msp is there any alternative option for dis .
LikeLike
I have given the source file path….then the destination file also.
After pressing the convert option when checking the resources it shows a message ” Access violation at address 0045D728 in module MpptpMpx.exe Read of address 00000000
Can you explain what this is please. Thank you
LikeLike
Because Oracle stopped supporting this utility so it’s very hard to find the error reason.
In my case I use it on Windows 7 32bit and it work properly.
LikeLike
It works for me thank you
LikeLike
Thanks… is useful
LikeLike
i tried it, but the following error message is coming after the project calender exceptions are read,
“‘BD? 2.00’ is not a valid floating point value” please help
LikeLike
Hi.
You can try to change that character value to normal Latin character, delete any special character
LikeLike
Hi,If anyone has problem with conversion due to currency symbol + ” 0.00 is not a valid floating point value” then try to remove currency symbol from being displayed. I think currency symbols like EUR or USD are hardcoded and those work properly.
Artur
LikeLike
Its a virus, my Avira already quarantined it the moment I drop on the desktop. Don’t even download guys…
LikeLike
Oh really? In my computer it doesn’t notify this is a virus.
This software is made by Oracle so I don’t think it’s virus
LikeLike
I am using R16.2 Version of primavera. While exporting from primavera to MS projects , MPX file is getting created. Iam using MSP 2016 version where I am unable to open the file. Kindly provide solution .
Regards
LikeLike
If you use MSP 2016, I suggest you export from P6 to MSP 2016 in XML format. It’s more compatible.
LikeLike
i’ve successfully converted and imported to P6. However, the lead and lag time in predecessor are not same after conversion. For example, FS+20days become FS+3days; FS-6days become FS-1day
LikeLike
I guess because of the calendar which was used to calculate lag/lead duration.
MS Project uses the Successor calendar for lead and lag calculation, whereas P6 has the option for predecessor, successor, project or 24 hour calendar. If the P6 schedule is set with an option that is not similar to the MS Project option then the same result may not be achieved.
LikeLike
How do I set the Successor calendar in P6 (as default?) prior importing project from MPX? Because by default the MPX that imported into P6 is using Predecessor calendar and all the lead/lag time will run off immediately upon imported.
LikeLike
It is apparently because of calendar definition (how many hour per day) different between P6 and MS Project.
This issue need to be researched thoroughly to have a solution.
Maybe in future I will provide this support service.
LikeLike
Thanks. It works for me.
LikeLike
hi Khuong Do
I am importing xml file from (2019 version mpp) to P6 Version 17(x86)
The error encountered in log :
Failed to load type for module CommandLineModule.
Error was: An exception occurred while initializing module ‘CommandLineModule’.
Can you pls help? how to resolve
LikeLike
hi Mr Khuong,
Many thanks for providing the mpp to mpx converter. I compared the MSP and P6 after the import and they are same.It works!
LikeLiked by 1 person