Just like me, I bet you guys may wonder what is the ratio between Primavera P6 EPPM user (Web based interface) and P6 PPM user (Window application interface) from all over the world.
So let’s vote.
Hopefully Oracle will base on the result to improve the product which is more popular.
Is there a way to import resources loading from excel to do bucket planning in P6.
LikeLike
Hi. I never try it before. I don’t think it’s possible
LikeLiked by 1 person
I hope you will make example for Bucket planning. From my understanding Bucket Planning can be done manually in P6 stand alone environment. How about in p6 web application can we do Bucket planning using or importing values from excel.
LikeLike
Hi.
Bucket planning is simply “manually distribute resource assignment”. You can refer to this article: https://doduykhuong.com/2017/03/07/how-to-assign-resource-resource-loading-make-resource-plan-in-primavera-p6/
In this article, I use the Resource Curve function. However, if you want to do Bucket planning, just simply double click on assignment value and change to your value.
LikeLike