Accomplished project planning and scheduling professional with over 20 years of experience in residential buildings, urban railway/metro, power plants, and refinery & petrochemical plants (civil packages) across Asia. Specialized in delay analysis, EOT claims preparation, and Primavera P6 implementation. Proven track record in supporting dispute resolution and arbitration cases. Dual degree holder in Engineering and Economics, and a certified Primavera P6 Authorized Trainer.
View all posts by Khuong Do
Hi doduykhuong,
I am presently using R15.2. When I try the Export/Import feature of P6, it says” Excel Import/Export requires MS Access Database engine”, what shall I need to do?
LikeLike
Hi there.
I suggest you can post question on Primavera group on Linkedin. There are lots of member can answer the question. This is the link to the group https://www.linkedin.com/groups/153246
LikeLike
Hi Doduykhuong,
Please be introduced, I am from Jakarta (Indonesia), I am glad to see you on your blog, the topic is refreshing me to try this program. I hope you can release all the item on Primavera commands and description how to use the item per item of the field in the Primavera.
Thanks regard
TBP
LikeLike